Air quality databases at NILU. EBAS version 1.01.
Krognes, Terje; Gunstrøm, Tor-Øivind; Schaug, Jan (NILU TR; 3/95, Research report, 1995)A relational database structure has been defined to accomodate both the requirements of the EMEP immision database, the AMAP air quality database, and potential developments of these projects. The fundamental concepts of ... -
Contract EV4V-CT90-0222 Peroxy acetyl nitrate intercalibration. Cost statement no 2. 1 May 1992 to 30 April 1993.
Krognes, Terje (NILU TR;8/93, Research report, 1993)The PAN intercalibration project is a comparison of methods for calibrating PAN (peroxyacetylnitrate) standards. The progress report gives a short description of the activities from each participant for the period I May ... -
Contract EV4V-CT90-0222 Peroxy acetyl nitrate intercalibration. Progress report no 2. 1 May 1992 to 30 April 1993.
Krognes, Terje (NILU TR;7/93, Research report, 1993)The PAN intercalibration project is a comparison of methods for calibrating PAN (peroxyacetylnitrate) standards. The progress report gives a short description of the activities from each participant for the period 1 May ... -
Contract EV4V-CT90-0222. Peroxy acetyl nitrate intercalibration. Consolidated cost statement.
Krognes, Terje (NILU TR;12/94, Research report, 1994)The PAN intercalibration project is a comparison of methods for calibrating PAN (peroxyacetylnitrate) standards. The consolidated cost statement covers the entire project period from 1 May 1991 to 31 December 1993. -
Contract EV4V-CT90-0222. Peroxy acetyl nitrate intercalibration. Cost statement no 3 1 May 1993 to 31 December 1993.
Krognes, Terje (NILU TR;6/94, Research report, 1994)The PAN intercalibration project is a comparison of methods for calibrating PAN (peroxyacetylnitrate) standards. The progress report gives a short description of the activities from each participant for the periode 1 May ... -
Contract EV4V-CT90-0222. Peroxy acetyl nitrate intercalibration. Progress report no 3 1 May 1993 to 31 December 1993.
Krognes, Terje (NILU TR;5/94, Research report, 1994)The PAN intercalibration project is a comparison of methods for calibrating PAN (peroxyacetylnitrate) standards. The progress report gives a short description of the activities from each participant for the periode 1 May ... -
ESA Campaign Database (CDB) User Manual.
Vik, Aasmund Fahre; Krognes, Terje; Walker, Sam-Erik; Bjørndalsæter, Sjur; Stoll, Christoffer; Bårde, Trygve; Paltiel, Roland; Gloslie, Bjørn (NILU TR;05/2006, Research report, 2006)The current document gives an introduction to the functionality of the ESA Campaign Data Base (CDB) and furthermore provides detailed information on metadata definitions and standards. The document contains sections for ... -
NADIR News No. 2/2003.
Vik, Aasmund Fahre; Braathen, Geir Ole; Krognes, Terje; Harris, Neil (NILU TR; 11/2003, Research report, 2003) -
PAN measurement technique, Part 1. Experience gained at NILU in 1986- 1987. Review of ECD theory.
Krognes, Terje (NILU TR;5/91, Research report, 1991)The technical details of the PAN measurement technique (calibration methods not included) used at NILU in the years 1986-1987 is described. A review of electron capture detector theory is included. -
Preparations for PAN instrument intercomparison. Offenbach, NILUs first visit 7 to 9 September 1993.
Krognes, Terje (NILU TR;5/93, Research report, 1993)An intercomparison of PAN (peroxyacetyl nitrate) monitors is in progress in the Offenbach branch of the Umweltbundesamt. The report describes recent results obtained with the NILU PANalyzer and the bag calibration method ... -
Progress Report No. 1/Cost Statements. Step Contract EV4V-CT90-0222.
Krognes, Terje (NILU TR;7/92, Research report, 1992)Progress reports and cost statements have been prepared by all participants in the STEP PAN intercalibration project, in the form required by the CEC. Delays have been explained, and a revised project schedule is included. -
REBUILT PHILLIPS SO2-MONITOR ON MOBILE PLATFORM.
Krognes, Terje (NILU TR;7/85, Research report, 1985)Philips S02 monitors have previously been modified for measurements in the ppb-range. New modifications allow mobile operation. Vibrations increase the noise signal, and the detection limit increases from 1 µg/m3 to 3 ... -
STEP PAN INTERCALIBRATION PREPARATIONS. Project Planning Part I
Krognes, Terje (NILU TR;7/90, Research report, 1990)A collection of documents concerning the planning of a PAN intercalibration project. Part 1 includes the project proposal to the EC STEP programme. -
STEP PAN intercalibration - Contract EV4V-CT90-0222 (CEC, DG XII/B/2). Phase prep. II - Internal report.
Krognes, Terje (NILU TR;11/91, Research report, 1991)The first plenary meeting of the project group is described. The plans for the PAN standard distribution in the next project phase are described in detail. -
STEP PAN intercalibration preparations. Project planning part 2.
Krognes, Terje (NILU TR;4/91, Research report, 1991)The administrative process of formalizing the STEP project contract for proposal STEP PL-900289 is described. (The project proposal was described in part 1). Relevant letters, contract texts etc are given in 21 enclosures.